Case study · Enterprise platform · Google Cloud (AppSheet)

Adding AI to a platform 2.5 million people already trust

Modernizing a mature no-code platform for AI across seven product surfaces, without breaking the depth enterprise customers depend on.

Platform

2.5M+ monthly active users, up from 1.9M year over year​

Scope

AI creation, data context, platform extension, agent access

Context

320K+ enterprise apps ​ | 230K+ daily active bots​

Role

UX lead across 7 product surfaces End-to-end design and mixed-methods research

The challenge

A mature platform millions rely on had to absorb AI without breaking what made it valuable.

AppSheet is a deep enterprise platform that no-code business users rely on every day. Adding AI could not mean rebuilding it, and it could not mean bolting AI onto the side. The work was to modernize how people enter the platform, build inside it, and extend it to agents, while protecting the depth mature enterprise customers depend on. I led UX across seven product surfaces in this modernization, from AI tasks in automation through governed agent access.

 

AI creation

Cutting the distance from intent to a working app.

Business users with a clear job to do were getting stuck before they even started: schema setup, template browsing, and database design stood between them and a working app. The new entry point let them describe the job in natural language, generated an app and supporting data, then handed control back to the AppSheet editor for deterministic refinement. I was the primary designer through implementation, launch, and post-launch.

Intent became the start / Gemini-backed generation / deterministic editor handoff

Natural-language creation, the generation step where the user describes the job in plain language

Gemini Powered LLM APp Creation

Data context, selecting which tables and signals are exposed to AI

AI TasK in Enterprise Automation

Fig. 01 · Enriching a Mature Platform Experience with AI

Data context

Making AI automation steerable across large data environments.

As AI Tasks adoption grew, automation creators working across multiple databases could not predict or steer how AI would behave in abstract workflows. Data context gave them a clearer way to expose the right tables and signals to AI, with inline error resolution that caught mistakes before they propagated. I led end-to-end design and the user research.

 

↓ 23%

Abandonment
 

↑ 17%+

Task success

↓ 67%

Expression warnings

↓ 55%

New-expression warnings
 
Data context, selecting which tables and signals are exposed to AI

Context applied to a task

The prompt-to-app moment: plain language in, working structure out.

Data context, inline error resolution catching a mistake before it propagates

Inline error resolution

Fig. 02 · Data context exposing the right tables and signals to AI, with inline error resolution

Mixed-methods research

A mixed-methods study chose the design direction, and first-time retention rose from 18% to 22%.

Enterprise app creators consistently hit a complexity ceiling where the visual builder ran out of room and expressions became the only path forward. Mixed-methods research compared three design directions for the Expression Assistant, and the chosen design lowered cognitive load and made expression workflows easier to finish.

N=86 quantitative study

N=6 qualitative follow-up

ANOVA-backed concept selection

Role: led end-to-end design and research

Relative comparison across measured dimensions. Concept C selected. Full statistics in the appendix below.

Dimension

Concept A

Concept B

Concept C

Usefulness

Lower

Mid

Highest

Ease of use

Mid

Lower

Highest

Perceived cognitive load

Higher

Mid

Lowest

Task flow

Mid

Mid

Smoothest

Satisfaction

Lower

Mid

Highest

Quantitative results tables from the N=86 study with ANOVA-based concept selection

Fig. 03 · Quantitative results tables from the N=86 study, with ANOVA concept selection

Extending the platform

Three surfaces that widened where AppSheet reaches.

Making AppSheet feel native inside Docs.

Knowledge workers writing reports and reviewing approvals were context-switching every time they needed AppSheet data. Smart Chips put structured AppSheet records directly into Docs, so the handoff felt like a Workspace-native interaction.

Role · Co-designer on the end-to-end flow and UX research

 

Platform records embedded inside a Google Doc as Smart Chips

In Google Docs

A platform app surfaced inside Google Chat

In Google Chat

Fig. 04 · AppSheet records surfaced inside Google Docs and Google Chat

A 0 to 1 Gantt view that supported a major Cloud commitment.

A major enterprise customer needed project-planning AppSheet had never offered, scoped at Google Cloud leadership level with a tight timeline. The new Gantt view aligned a familiar planning model to AppSheet’s existing logic and views, with phasing defined under real resource constraints.

 

First Gantt in AppSheet history · Role · End-to-end UX design lead

Configuring the Gantt view in the platform editor

Configuring the view

The Gantt chart rendered from platform data

The Gantt chart

Fig. 05 · The first Gantt view in AppSheet history

Shipping the harder path when the data would not cooperate.

Decision-speed

Spec

Decision

Ship semi-manual mapping over one-click import

Constraint

Tight timing and resources, multi-year commitment

Trigger

Incoming schemas did not match what a Gantt view needs

Call

Higher friction setup, with guardrails

Reversibility

Guided one-click path designed, deferred

Role

End-to-end UX design lead

The stakes

A 0 to 1 feature, shipped under tight timing and resource constraints, tied to an executive-sponsored multi-year commitment. It had to land, and it had to land on schedule.

 

The intended path

Import and convert a customer’s existing documents and databases from a generic incumbent project tool into an AppSheet database, then build the Gantt view in one click with minor customization.

 

The reality

Incoming databases did not arrive in the structure or schema a Gantt view requires. The one-click promise broke at the data layer.

 

The call

I explored and presented the ideal low-friction path, but ship constraints forced the less intuitive route: semi-manual schema setup, mapping each data structure to the Gantt feature by hand.

Risk mitigation, two layers

I explored and presented the ideal low-friction path, but ship constraints forced the less intuitive route: semi-manual schema setup, mapping each data structure to the Gantt feature by hand.

 

Inline user guidance on the more complex steps, clearer error messages, and troubleshooting documentation linked from both the guide and the inline errors.

A third-party implementation partner, briefed and resourced by the team, to help customers adopt the feature inside their environment.

What it protected

On-time delivery of the commitment, and the feature’s adoption. The inline guidance and a briefed implementation partner were there to keep a harder setup from ending in task failure or abandonment.

 

What it cost

A heavier first run. Creators did setup work the ideal path would have removed, on the less discoverable route.

 

A native database that made enterprise apps easier to adopt and scale.

App creators running large apps on legacy or third-party data kept hitting reliability and performance ceilings. A stronger native database UX and a guided migration flow lowered the cost of moving into the Google Cloud ecosystem.

Role · Led end-to-end design and research

 
The native database interface

Database interface

The guided database migration flow shown as a stepper

Guided migration stepper

Fig. 06 · Native AppSheet Database with guided migration

Extending the platform

Opening a mature platform to agents without giving up control.

App creators wanted their AppSheet apps usable by AI agents from Forge and other platforms, but IT admins needed clear guarantees about which data, operations, and permissions were exposed. MCP let creators selectively share app capabilities while keeping databases, bots, and automations under explicit governance. I was the end-to-end UX lead.

 

Selected capabilities exposed / data access stayed governed / operations remained bounded

MCP setup, selecting which app capabilities are exposed to agents

Selecting capabilities

MCP setup, granular permission levels for data and operations

Permission levels

Fig. 07 · MCP configuration governing which capabilities agents can reach

Choosing the faster route into agents, on purpose.

Decision-speed

Spec

Decision

Start with MCP, phase guided conversion

Constraint

Partial backend integration, time to market

Paths weighed

Two, explored in parallel

Evidence

Engineering proofs of concept, both paths

Call

Ship MCP first, phase granular permissions

Reversibility

Phased, not dropped

Role

End-to-end UX lead

The constraint

AppSheet’s backend was not fully integrated with the surrounding product ecosystem, and time to market mattered. Opening apps to agents meant a hard fork between two routes, and the team could not fund both at full depth on the timeline.

 

Path A Guided conversion

Invest in the backend so creators could turn an existing app into an agent in two or three clicks, with light instruction, surfaced natively across the company’s product surfaces. The most intuitive and discoverable route, and the slowest to build.

 

Path B MCP server

Ship a faster, less discoverable route that opened apps to agents as tools through an MCP server, with granular permission levels built for enterprise security and data governance.

 

The work

I explored and iterated the discoverable path first, the one that would surface on the AppSheet landing page and other product surfaces, and in parallel designed the MCP feature with detailed, granular permission controls. Engineering ran proofs of concept on simple app conversion against the MCP path. After debate, and after I showed how the MCP design kept the enterprise user in full control of security and governance, the team chose to start with MCP and phase the granular permission work.

 

The honest read

This was not the most discoverable or intuitive way for the existing base to bring their apps into an agentic workflow. The team chose it to move faster, hold momentum against a generic competitor, and keep creators who wanted to test agentic tools as a possible replacement for the toolset they already counted on.

 

Risk mitigation

The granular, enterprise-grade permission and governance layer was what made the faster path acceptable to ship. Its rollout was phased rather than dropped, so control never lagged behind access.

 

What it protected

Momentum on agents, and enterprise control over which data, operations, and permissions were ever exposed.

 

What it cost

Discoverability. The first way in was a configuration step, not a two-or-three-click conversion surfaced where creators already work.

 

Impact

Recognized impact across adoption, growth, and the enterprise base.

2.5M+

MAU, up from 1.9M YoY

18 → 22%

First-time creator retention

Award

Google Cloud Tech Impact Award

100K+

Migrations supported

The deeper interaction designs and the complete research are available on request.
Request the full case study →

 

Impact

Restraint as much as invention.

Modernizing a platform millions of people depend on is a problem of restraint as much as invention: add the new capability, and protect what already works. That balance, designing for the people who cannot afford the tool to break, is the same problem I work on everywhere a mistake has a real cost.